Saturday, April 14, 2012

The Train Tunnel Cache

This tunnel started in August 1883 for a train to go through the mountain.
It only goes back about 150 feet to the back wall, and very tall, about 30 + feet high and about 20 wide. The work lasted about 6 months all end on Feb 8, 1884, run out of money.
About 3 miles round trip and was able to miss the rain and snow, but the high winds was blowing pretty good.
I need to go back and find the other tunnels. Cache.


I did not go in it was to wet and muddy.


No comments: